Rectify trip hazards [done 2022]
Stage 1, as built, left us with trip hazards at:
- the low retaining wall between our southern concrete apron and our southern lawn, and
- the unfinished gravel path at the south-east corner of the Stage 1 building (Pod 4).
These have since been rectified. Drainage problems to the south of Pod 4 remain.
Other recent improvements have included:
landscaping and plantings around the front entrance / birdbath area and
upgraded exterior lighting for improved safety and security.